The Lofts Parking Lot Reconstruction

Project overview

This project included removal and replacement of all curbing, rebuilding and raising numerous drains, asphalt repairs, concrete sidewalk repairs, concrete dumpster pad installation, and a 2" Overlay of the entire property. The work was completed in sections over 9 days with 1/3 of the lots shutdown at a time for 3 days.